Time: 2017/04
As EPC general contractor of the project, we build a distributed photovoltaic power station on the roof of two workshops of the Anhui Cable Co., Ltd., with a total installed capacity of 3.73MWp and covering an area of 37,700m2. The project is launched by Far East Holding Group (hereinafter referred to as “the Group”) as the second photovoltaic power generation projects developed by the Group. After joining the Group, we have received the recognition and endorsement from leaderships of the Grou...
Time: 2017/04
Hengyang New Energy Science and Technology Co., Ltd. (Dingbian) is a joint venture established by Ningxia Hengxinda New Energy Science and Technology Co., Ltd. and other investors, with the registered capital of RMB 10 million. The company focuses on investment, construction, operation and repayment of loan principal and interest of the Shaanxi Dingbian (Hengyang) 30MW PV Power Station Project. Adhering to the operation principle of “providing green and clean energy, striving to become an excell...